top of page

TECH REPORT 1

[ DOWNLOAD ]

This report introduces the project, discussing the overview, delivery system, team organization, project systems, and provides a basic SF cost estimate and milestone schedule

TECH REPORT 2

[ DOWNLOAD ]

This report delves into the mechanical system of the project, evaluating the financial, time, and logistic requirements to assemble the air handling system specifically

TECH REPORT 3

[ DOWNLOAD ]

This report examines the constructability of the project, focusing on the difficulties faced by the project team, and the solutions that they have employed thus far

   ** While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Richard Knouff. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

 Senior Thesis Main Page    Penn State    AE    AE Computer Labs  Contact

bottom of page